Autoclaved lightweight concrete

English    
  844 3786 8668
Cost estimates Contact us
Solutions
Cost solutions
GAKIBI ALC is provided based on the information management of the entire construction of the project; the aim is to optimize the basis for management process/ schedule control and cost on the urgent request of the owner and contractors. Information is accurately aggregated from the estimated data, the cost of inputs, design, procurement and construction that will bring the maximum efficiency when implementing projects.
 
We do guarantee to offer customers the best cost solution to control and maximize the available resources.
  • Project construction: ensuring scientific, creative and optimizing resources.
  • Estimates and cost: use of cost data and resources perfectly.
  • Design and procurement: integrated with building design system , risk management system .
PRICE COMPARISON TABLE 
BLOCK WALL FROM GAKIBI-ALC AND FROM RED BLOCK
(Option: Build WALL POCKETS 100 not render but directly putty)

I. Building wall from GAKIBI-ALC brick (1m2 wall for wall 100, completing of matit putty)

1/ Materials

No Materials Norm
Price unit Amount
1 GAKIBI ALC block 0.976 m3 1.150.000 112.240
2 ALC building mortar 4 kg 3.000 12.000
3 Nippon putty (completed  2 sides with thickness of 3mm) 3 kg 2.500 21.000
Total:
145.240
 
2/ Builder

No Work Volume
Price unit Amount
1 Building from GAKIBI ALC 0.1 m3 500.000 50.000
2 Matit putty 2 kg 20.000 40.000
Total:
90.000

 Total cost of construction for 1m2 of wall 100 with completed 2 sides of matit putty: 235.240 VNĐ

II.  Wall built of red brick (calculated for 1m2 of wall 100 with 2 hole brick: 210 x 100 x 60, completing of matit putty)

1/ 
Construction Section
 
No Material Norm Price unit Amount
1 2 hole block 65 brick 1.368 88.920
2 Cement PC30 2.85 kg 1.009 2.876
3 Grained sand 0.027 m3 63.000 1.701
4 Other materials 6.5 %   6.077
5 Builder 0.1 m3 470.000 47.000
Total: 146.574

2/ Plastering: Wall plastering VXM # 75, 2cm thickness (2-sided plastering = 2m2)
 
No Material Norm Price unit Amount
1 Cement PC30 16.56 kg 1.009 16.709
2 Grained sand 0.048 m3 63.000 3.024
3 Other materials 5 %   987
4 Builder 2 m3 45.000 90.000
Total: 110.720

3/ Nippon putty
 
No Material Norm Price unit Amount
 1 Nippon putty (completed  2 sides with 3mm thickness)  2.4  kg  8.000  19.200
 2 Other materials  5  %    960
 3 Builder  2  m3  20.000  40.000
Cộng: 60.160

4/ Cost of management, construction machines and other costs: 20.000 VNĐ

 Total cost of construction for 1m2 of wall 100 with completed 2 sides of matit putty: 315.368 VNĐ
 
(*) CONCLUSION:
  • GAKIBI ALC wall with 100 thickness completing of matit putty:           235.240VNĐ
  • Wall built of red brick completing of matit putty:                                      315.368VNĐ
=> Cost of construction by GAKIBI-ALC is cheaper than by red brick: 80.128 VNĐ (Equivalent to 25.4%)
About us
Products
Solutions
Applications
Documents
CÔNG TY CỔ PHẦN UDIC KIM BÌNH
Nhà máy: xã Kim Bình, huyện Kim Bảng, tỉnh Hà Nam
Văn phòng: tầng 2, tòa nhà Trung Yên 1, KĐT Trung Yên, Cầu Giấy, Hà Nội
Tel: 844 3786 8668 - Fax: 844 3786 8568
Web: www.udickimbinh.vn - Email: gakibi@udickimbinh.vn
         
© 2013 Copyright by udickimbinh.com.vn.
All rights Reserved.
Tour Đà NẵngTour đảo Ngọc VừngTour Mộc Châu Tour viếng bác giápTour viếng mộ Đại tướng Võ Nguyên GiápDu lịch đồng bằng sông Cửu LongTour SapaTour Điện BiênTour đảo Phú QuốcTour Mù Cang ChảiKhách sạn Mũi NéKhách sạn Phú QuốcTour đảo Cát BàTour Trà CổTour Hạ LongDu lịch đảo Cát BàTour đảo cát bàDu lịch Quan LạnTour đảo Quan LạnTour đảo cô tôDu lịch đảo cô tôDu lịch đảo Ngọc VừngTour Hàng Châu Tô ChâuTour SigaporeTour Thái Lan gia rẻ Du lịch Phú QuốcTour Đà Nẵng Hội AnTour Nha TrangTour Yên Tử - chùa Ba VàngTour Hà GiangTour biển Sầm SơnTour biển Cửa LòTour biển Hải TiếnTour biển Hải Hòa